Mivan Inventory Protocol (Receiving Process)
                
                
    
        
        
    
    
        
            
                
- Materials received must be checked by component wise and
 verified with the packing list.
- Store personnel and MIVAN supervisor and Engineer must be present to monitor the entire material receiving process.
- All the materials must be received in tonnage.
- If the receiving site receives damaged materials, then they must inform the centralized yard with proper details and photographs.
- The receiving site must be, prior to receive the soft-copy of the packing list before the receiving of materials.
- Receive of material will done through electronically generated challan.
- All the standard component should be cleaned with scrapper and wire brushes Wire brushes to be used on side rails only and scrapper on concrete contact face.
- To reduce the cost towards manual cleaning Chemical solution option may be explored.
 
 
             
            
      
  
 
	
  
 
                
                
                
          
      
                                          
              